Interstate 580 (Nevada)

From Wikipedia, the free encyclopedia
  (Redirected from Carson City Freeway)
Jump to navigation Jump to search

Interstate 580 marker
Interstate 580
I-580 highlighted in red
Route information
Auxiliary route of I-80
Maintained by NDOT
Length35.187 mi[1] (56.628 km)
ExistedOctober 27, 1978–present
HistoryNumber approved on October 27, 1978; constructed in phases 1964–2017; signed in 2012
Major junctions
South end
US 50 / US 395 / US 395 Bus. in Carson City
Major intersections US 50 in Carson City
North end I-80 / US 395 in Reno
Location
CountryUnited States
StateNevada
CountiesCity of Carson City, Washoe
Highway system
  • Nevada State Highway System
SR 579 SR 582

Interstate 580 (I-580) is a 35.187-mile (56.628 km) Interstate Highway in Western Nevada. It runs concurrently with U.S. Route 395 (US 395) from an intersection with US 50 near the southern boundary of Carson City to the Reno Spaghetti Bowl interchange with I-80 in Reno. The freeway provides a high-speed direct route between Lake Tahoe and Carson City to Reno and I-80.

Construction on a freeway between Carson City and Reno was planned since 1956, but construction did not occur until 1964. The freeway opened in sections, with the final section opening on August 2, 2017. The I-580 designation was approved on October 27, 1978, but the freeway was not signed as such until the portion between Reno and Carson City was completed following the opening of the Galena Creek Bridge in late August 2012.

Route description[edit]

I-580 and US 395 route markers between Carson City and Reno

I-580 runs from an intersection with US 50 in Carson City to an interchange with I-80 near downtown Reno. The only portion remaining to be constructed is the interchange at the freeway's southern terminus. Within Reno, the freeway is designated as the Martin Luther King, Jr., Freeway. Within Carson City, the freeway is designated the Carson City Deputy Sheriff Carl Howell Memorial Freeway, in honor of a sheriff's officer who was shot to death while attempting to rescue a victim of domestic violence from her house.[2][3]

The freeway begins at the junction of US 395 with the Lake Tahoe leg of US 50 and follows the eastern edge of Eagle Valley, where most of the population of Carson City resides. The highway loosely follows the former alignments of Edmonds Drive and Lompa Lane along the eastern half of the city, which were relocated or truncated to make room for the freeway.

After rejoining the original alignment of US 395 at the Carson Tahoe Regional Medical Center, the highway crests Lakeview Hill to enter the Washoe Valley. The portion of I-580/US 395 and US 395 Alternate through Washoe Valley are prone to high crosswinds and, as such, the highways are frequently closed to high-profile vehicles. During prohibited times, trucks are rerouted to Eastlake Boulevard and US 395 Alternate (US 395 Alt.), which is the old route of US 395. The high wind area ends near the Bowers Mansion interchange near the northern end of the Washoe Valley.

Unlike the old US 395 which ran along the valley floor of Pleasant Valley, I-580 is routed in the mountains overlooking the valley. While traversing Pleasant Valley, the highway uses large portions of the old right-of-way for the Virginia and Truckee Railroad,[citation needed] and crosses the Galena Creek Bridge, the largest cathedral arch bridge in the world.[4] Upon the descent from these mountains the highway cuts through the center of one of the largest geothermal power plants in the United States, Ormat Industries' Nevada Power station, just before entering Reno.

View from U.S. Route 50 eastbound towards southern end of I-580 at intersection with U.S. Route 395.
View seen by northbound traffic approaching north end of I-580 at interchange with I-80

At the extreme southern edge of Reno, the highway has a junction with the Mount Rose Highway (SR 431) and Geiger Grade (SR 341), which connect the freeway with North Lake Tahoe and Virginia City, respectively. Upon entering Reno, the freeway proceeds in a generally northern direction, crossing Virginia Street, the old routing of US 395, several times. Along the way the freeway passes to the side of The Summit mall, Meadowood Mall and Reno–Tahoe International Airport. The elevated freeway also passes over a bus garage used by RTC Washoe, the local bus agency.[5] The I-580 designation ends at the Reno Spaghetti Bowl where the highway crosses I-80; however, the freeway continues on only as US 395, heading towards the north valley neighborhoods of Sun Valley, Lemon Valley, Stead, Cold Springs Valley and Bordertown (parts of which are in the City of Reno[6]) before eventually crossing the California state line.

History[edit]

Old US 395 running through Pleasant Valley, as seen from Geiger Grade (SR 341), with the I-580 extension under construction in the mountains above

Development of the I-580/US 395 freeway has been in planning since 1956, but significant construction did not occur until 1964.[7] The freeway would be opened gradually over time, and would initially be constructed in two main separate sections before 2012.

The first segment of freeway constructed along I-580 was the Washoe Valley segment, which was constructed between 1964 and 1970 between present-day Bowers Mansion Road/Carson–Reno Highway (exit 50, now exit 16) near Washoe City, south through Washoe Valley to just north of North Carson Street (exit 43, now exit 8) in Carson City.

Northbound I-580 and US 395, approaching the Neil Road and Meadowood Mall Way interchange (exit 62, now exit 30)

The Reno section was constructed between 1973 and 1996. In 1973, the section running between US 395 Bus. (exit 72) to East Second Street/Glendale Avenue (exit 67, now exit 35) in Reno opened to traffic. This section was extended south to Mill Street (exit 66, now exit 34) in 1978, Plumb Lane/Villanova Drive (exit 65, now exit 33) in 1979, South Virginia Street/Kietzke Lane (exit 63, now exit 31) in 1981, Neil Road/Meadowood Mall Way (exit 62, now exit 30) in 1986, South Virginia Street (exit 61, now exit 29) in 1989 and Mount Rose Highway (exit 56, now exit 24) in 1996. The Carson City section was constructed in the 2000s with the construction of the Carson City Bypass project. The first phase completed the freeway from North Carson Street (exit 43, now exit 8) south to East William Street (exit 39, now exit 5) in 2006. The freeway was extended south to Fairview Drive (exit 38, now exit 3) in 2009. On August 2, 2017, the final section of the freeway between Fairview Drive (exit 38, now exit 3) and South Carson Street in Carson City opened to traffic.[8]

In 2012, the section between Mount Rose Highway (exit 56, now exit 24) and Bowers Mansion Road/Carson–Reno Highway (exit 50, now exit 16) south of Reno opened following the opening of the Galena Creek Bridge to traffic in late August 2012, connecting the two main segments together. After the completion of this section, the freeway south of I-80 (US 395 southbound exit 68 and I-580 northbound exit 36) was signed as I-580, officially connecting Carson City to the Interstate Highway System. This left four other state capitals still not served by the Interstate Highway System: Dover, Delaware; Juneau, Alaska; Pierre, South Dakota; and Jefferson City, Missouri.[9]

The I-580 designation was first approved by the American Association of State Highway and Transportation Officials (AASHTO) on October 27, 1978; at the time, this route extended from I-80 to US 395 (South Virginia Street, at exit 63, now exit 31).[10][11] AASHTO approved the remainder of planned I-580, to the southern terminus at US 50, US 395 and US 395 Bus. south of Carson City, at its December 7, 1984, meeting.[12] Despite the route number being approved and being shown on some maps in the 1980s, I-580 was not signed along the Interstate until the freeway gap between Mount Rose Highway and Bowers Mansion Road was completed in 2012.

The routing for I-580 and US 395 had been considered as a potential alignment for the extension of I-11 from US 95 north of Walker Lake to I-80 at the Spaghetti Bowl interchange in Reno.[13][14]

In October 2019, NDOT began replacing US 395 exit numbers with I-580 exit numbers per federal requirements on the Manual on Uniform Traffic Control Devices.[15]

Future[edit]

The only project yet to be completed as of 2022 is the South Carson Street SPUI interchange.[16]

Exit list[edit]

Old exits on I-580 were numbered according to US 395 mileposts.

CountyLocationmikmOld exitNew exit[17]DestinationsNotes
City of Carson City
0.00–9.43
0.000.00
US 50 west / US 395 south / US 395 Bus. north (S. Carson Street) – South Lake Tahoe, Minden, Gardnerville
Temporary at-grade intersection; planned upgrade to SPUI interchange; southern end of US 50/US 395 concurrency; S. Carson Street was former SR 529 north/US 50 east/US 395 north[18]
2.844.57383Fairview DriveFormer US 50 west/US 395 south
4.577.35395 US 50 east (E. William Street) – Dayton, FallonNorthern end of US 50 concurrency; E. William Street was former SR 530 west/US 50 west/US 395 south
6.7310.83416College ParkwayFormer SR 531
8.0312.92427Arrowhead DriveNorthbound exit and southbound entrance
8.4613.62438
US 395 Bus. south (N. Carson Street)
Southbound exit and northbound entrance; former US 395 south
Washoe
9.43–35.187
Washoe Valley9.3715.084410Eastlake Boulevard (to US 395 Alt.)Former SR 428; serves Washoe Lake State Park
11.2018.024612Bellevue Road
Washoe City15.4624.885016Old US 395 (US 395 Alt., Bowers Mansion Road, Carson–Reno Highway) – Washoe CityFormer SR 429 south/SR 430 north/US 395; serves Bowers Mansion
Pleasant Valley19.5031.38Galena Creek Bridge
Reno23.4637.765624 SR 431 (Mount Rose Highway) – North Lake Tahoe
24.9440.1457B25BS. Virginia Street south (US 395 Alt. south) – Virginia City, Washoe CitySouthbound exit and northbound entrance; former SR 430 south/US 395 south
25.4040.8857A25AS. Virginia Street north (US 395 Alt. north / US 395 Bus. north)Southbound exit and northbound entrance; former SR 430 north/US 395 north
25.5841.175926Damonte Ranch Parkway
26.8943.286028South Meadows Parkway (SR 426 west)
27.9845.036129S. Virginia Street (US 395 Alt. / US 395 Bus.)Former SR 430/US 395
30.1948.596230Neil Road, Meadowood Mall WayNeil Road was former SR 667
30.9749.846331S. Virginia Street (US 395 Bus.), Kietzke LaneSouthbound exit and northbound entrance; S. Virginia Street was former SR 430/US 395; Kietzke Lane was former SR 667
32.0351.556432Moana LaneDiverging diamond interchange; serves Reno-Sparks Convention Center
32.9553.036533 Plumb Lane (SR 653), Villanova Drive, Reno–Tahoe International AirportSigned as exits 33A (Villanova Drive, Plumb Lane) and 33B (airport) southbound
33.9354.616634Mill Street
34.4655.466735E. Second Street, Glendale Avenue (SR 648)
35.1956.636836 I-80 – Elko, SacramentoNorthern end of US 395 concurrency; signed as exits 36A (east) and 36B (west) northbound; I-80 exit 15
US 395 north – SusanvilleContinuation beyond northern terminus of I-580
1.000 mi = 1.609 km; 1.000 km = 0.621 mi

See also[edit]

References[edit]

  1. ^ Nevada Department of Transportation (January 2018). "State Maintained Highways of Nevada: Descriptions and Maps". Retrieved September 11, 2018.
  2. ^ Munson, Jeff (December 8, 2015). "Stretch of Carson City Freeway Officially Named in Honor of Deputy Carl Howell". Carson Now. Retrieved December 8, 2015.
  3. ^ Munson, Jeff (August 16, 2015). "Carson City Deputy Killed in the Line of Duty Identified". Carson Now. Retrieved December 8, 2015.
  4. ^ Robison, Mark. "Fact Checker: Is Galena Creek the world's longest cathedral arch bridge?". Reno Gazette Journal. Retrieved August 3, 2021. The Nevada DOT claim is accurate but 'cathedral' arch bridges are very rare and so it is sort of a record that is trying to be specific so they can claim the top spot. It is the second longest concrete arch in America after the Hoover Dam bypass bridge, which is an impressive achievement itself. However among all concrete arches in the world, it does not even rank among the top 20 so I can understand NDOT wanting to bring its status up in the ranks.{{cite web}}: CS1 maint: url-status (link)
  5. ^ "RTC Villanova Maintenance Facility Renovation and Expansion Project". City of Reno. p. 15. Retrieved October 4, 2018.
  6. ^ "Ward Map | City of Reno". www.reno.gov. Retrieved December 20, 2021.
  7. ^ Nevada Department of Transportation. "History & Overview". I-580 Extension Project website. Nevada Department of Transportation. Archived from the original on May 27, 2008. Retrieved September 11, 2008.
  8. ^ Deach, Ben (August 2, 2017). "Freeway Extension to Save Drivers Time in Carson City". Reno, NV: KOLO-TV. Retrieved August 2, 2017.
  9. ^ Rocha, Guy (February 28, 2006). "Carson City's freeway: a long time coming". Nevada Appeal. Retrieved June 24, 2018.
  10. ^ Special Committee on U.S. Route Numbering (October 28, 1978). "Route Numbering Committee Agenda Showing Action Taken by the Executive Committee" (Report). Washington, DC: American Association of State Highway and Transportation Officials. Retrieved November 7, 2014 – via Wikisource.
  11. ^ "A drive on 395 is a drive on 580". Reno Gazette-Journal. December 13, 1978. p. 27. Retrieved June 24, 2018 – via Newspapers.com. icon of an open green padlock
  12. ^ Special Committee on U.S. Route Numbering (December 7, 1984). "Route Numbering Committee Agenda" (PDF) (Report). Washington, DC: American Association of State Highway and Transportation Officials. Retrieved November 7, 2014 – via Wikimedia Commons.
  13. ^ Fuhs, Brandon (March 14, 2018). "Reno City Council Learns Potential Corridors for Future Interstate 11". Reno: KTVN. Retrieved February 14, 2021.
  14. ^ Marroquin, Art (July 13, 2018). "Public Meetings on Future of I-11 to Be Held in 7 Nevada cities". Las Vegas Review-Journal. Retrieved February 14, 2021.
  15. ^ "Freeway exit numbers along I-580 in Carson City to change". Nevada Appeal. October 4, 2019. Retrieved December 4, 2019.
  16. ^ "Capital Transportation Improvement Projects". Nevada Department of Transportation. Retrieved February 14, 2021.
  17. ^ Nevada Department of Transportation. "Exit Numbers on Interstate 580". Nevada Department of Transportation. Retrieved May 13, 2019.
  18. ^ "Capital Transportation Improvement Projects". Nevada Department of Transportation. Retrieved February 14, 2021.

External links[edit]

KML is from Wikidata